Need a Fast Investment Casting Quote for Heat-Resistant Steel Parts?
leading paragraph: Frustrated by slow, vague quotes for your critical parts? Waiting for answers delays your projects and costs you money. We provide a firm price, fast.
snippet paragraph: Yes, you can get a fast investment casting quote. To get your quote in 24 hours, provide us with complete 2D/3D drawings, the exact heat-resistant steel grade, your required quantity, and any special finishing or testing needs. We turn that information into a detailed quote quickly.

Transition Paragraph: Getting a fast quote isn't just about our speed. It's about you providing the right information from the beginning. This allows our engineers to give you a precise price without endless emails. Let me explain exactly what we need and how our process makes getting an investment casting quote so quick and simple. You'll see why many buyers trust us.
LOOP START
What Information Do We Need to Give You a Quote in 24 Hours?
leading paragraph: Tired of the back-and-forth emails just to get a simple price? This wastes your time and slows down your entire production schedule. We can quote fast with the right details.
snippet paragraph: For your 24-hour investment casting quote, we need four key things: 2D/3D drawings (STP, IGS files work best), specific material grade (like 1.4823), the order quantity, and any post-casting requirements like machining, heat treatment, or non-destructive testing (NDT).

Dive deeper Paragraph: A fast quote is an accurate quote. To make that happen, our engineers need clear instructions. Vague requests lead to vague prices and unexpected delays. When I first worked with a new client, Kevin from the U.S., he knew exactly what he wanted. He provided everything upfront, which made the process smooth.
Why Drawings are Critical
The 3D file (like STP or IGS) helps us calculate the part's weight and simulate the casting flow. The 2D drawing (PDF) is essential as it shows all the critical tolerances, surface finish requirements, and specific notes from your engineers. Without both, we are simply guessing at what you need, which is a waste of everyone's time.
Material and Quantity Details
Specifying the exact heat-resistant steel, like 1.4823, is crucial. Different alloys have very different costs. Also, tell us your order quantity. The price for 100 pieces is very different from 10,000 pieces because of how tooling costs and setup times are spread out.
LOOP END LOOP START
How Do Lead Times and Costs Vary for Heat-Resistant Castings?
leading paragraph: Worried about hidden costs and long production timelines for your parts? Unpredictable schedules can disrupt your plans and cost you sales. We explain all costs clearly and upfront.
snippet paragraph: The lead time for heat-resistant steel castings has two parts: tooling (3-4 weeks) and mass production (4-5 weeks). Costs depend on part complexity, material choice (special alloys cost more), part weight, and any extra machining or testing. We detail these in your investment casting quote.

Dive deeper Paragraph: Understanding the timeline and cost drivers helps you plan better. We are transparent about this because we want to be your long-term partner, not just a one-time supplier. The total price of your finished part is more than just the raw casting. It includes tooling, material, and any post-processing. For example, I remember a project for furnace components in Germany. The part was complex, so the tooling took an extra week. But because we communicated this early, the customer adjusted their schedule and there were no surprises. Here are the main factors that affect your final quote.
| Cost Factor | Description | Impact on Price |
|---|---|---|
| Tooling (Mold) | A one-time cost to create the mold for your specific part. More complex parts require more complex, expensive molds. | High (One-Time) |
| Material Cost | Heat-resistant steels contain expensive alloys like nickel and chromium. The market price of these metals fluctuates. | High (Variable) |
| Part Weight | Heavier parts use more material and take longer to cool, which increases the per-piece cost. | Medium |
| Post-Processing | This includes machining, heat treatment, surface finishing, and testing (e.g., X-ray). Each step adds cost. | Medium to High |
LOOP END LOOP START
Can You Show an Example of a Heat-Resistant Steel Casting Quote?
leading paragraph: Do you look at quotes and feel like you're reading a foreign language? Vague terms and hidden costs can turn a good deal into a bad one. Let's review a real example.
snippet paragraph:
Of course. A client needed furnace grates made from 1.4823 heat-resistant steel. They sent a complete request for quotation (RFQ) with drawings and quantity breaks. Within 24 hours, we provided a clear investment casting quote deta
iling tooling costs, per-piece prices, and a firm lead time.
Dive deeper Paragraph: Let's talk more about that client, Kevin, who owns a company in the U.S. He was tired of suppliers who took weeks to reply. He found us on Google and sent an RFQ for 1,500 furnace grates made from 1.4823 steel. His request was perfect, and that's why we could respond so quickly.
His email included:
- A 3D STP file of the grate.
- A 2D PDF drawing with all tolerances marked.
- A request for pricing at 1,500 pieces and 3,000 pieces.
- A question about our standard packaging method for international shipping.
Our team got to work immediately. Our engineers analyzed the drawings for manufacturability. We calculated the material cost based on the part's weight and the current price for 1.4823 alloy. Within 20 hours, Kevin had a professional quote in his inbox. It clearly separated the tooling cost from the per-piece price. He placed the order the next day.
LOOP END LOOP START
How Exactly Does Your 24-Hour Quotation Process Work?
leading paragraph: Ready to request a price but worried about a long, complicated process? Filling out confusing forms is frustrating. Our process is simple, direct, and built for speed.
snippet paragraph: Our 24-hour investment casting quote process is easy. Step 1: You email us your complete RFQ package. Step 2: Our engineers immediately review your files. Step 3: We calculate all costs. Step 4: You receive your detailed quote within one business day.

Dive deeper Paragraph: We built our business on efficiency. That starts with the very first step: the quotation. We have invested in a team and a process that eliminates waiting. You are a busy person, and you need answers, not excuses. Our 24-hour promise for an investment casting quote is not a marketing trick; it's our standard way of doing business. Here is how it breaks down.
Step 1: Your RFQ Submission (Hour 0)
You send your email with all the necessary files and information. The clock starts now.
Step 2: Engineering Review (Hours 1-8)
Our quoting engineers open your files. They check for manufacturability and confirm the material. If they see a potential problem, we contact you immediately.
Step 3: Cost Calculation (Hours 9-20)
We calculate costs for tooling, raw material, casting labor, heat treatment, and any testing. As a factory with 30 years of experience, we know our costs exactly. We don't have to guess.
Step 4: Quote Delivery (Hours 21-24)
We prepare a formal, easy-to-read quote and email it to you.
LOOP END LOOP START
Ready to Get Your Quote? Here's What to Send Us.
leading paragraph: Are you worried you might forget a crucial detail in your email? That small omission can cause delays and more back-and-forth communication. Use our simple checklist to get it right.
snippet paragraph: To get your fast, accurate investment casting quote, use our RFQ checklist before you send your email. It covers everything from 3D models and material grades to testing needs, guaranteeing a complete request and a quick response from our team.

Dive deeper Paragraph: I've seen thousands of RFQs over the years. The best ones are always the most complete. They allow us to move from quoting to production faster. To help you, we created a simple checklist. Just review this before you hit "send" on your email. It will ensure you've included everything our engineers need to provide your quote in 24 hours. A complete request shows us that you are a serious buyer, and we prioritize those inquiries.
Your RFQ Checklist
Use this table to prepare your request.
| Checklist Item | Yes / No | Notes |
|---|---|---|
| 3D Model File | (e.g., STP, IGS, X_T) | |
| 2D Drawing File | (e.g., PDF, DWG) | |
| Material Grade | (e.g., 1.4823, AISI 310) | |
| Order Quantity | (Include breaks if needed) | |
| Surface Finish | (e.g., Sandblasted, Polished) | |
| Testing Needs | (e.g., X-Ray, MPI) | |
| Shipping Destination | (Port or City) |
Ready for your fast, accurate quote? Send your drawings and checklist to us now.
LOOP END
Conclusion
Getting a fast, professional investment casting quote is simple. Provide clear information, and we will deliver a detailed price for your heat-resistant steel parts within 24 hours.
For a deeper overview of our process and real project cases, please visit our investment casting tank page.



